Every GM project follows the same four phases. Most kitchens take twelve weeks from contract to install. Closets and baths run faster.
Free first consultation, in-home or in our showroom. We talk about how the household actually lives — who cooks, where the kids sit, what's in your closet that you keep tripping over.
We measure on the second visit, after a project is committed.
Hand-drafted elevations first, then 3D renderings, then a final shop drawing set. Two rounds of revisions are standard. We don't fabricate until you've signed off on the cabinet drawings and the finish samples.
Fabrication happens in our Edgewater workshop. Cabinets are built to the shop drawings, finished in our climate-controlled spray booth, and individually photographed before they leave the floor.
Our installation crew handles delivery and final fitting on-site. Most projects install in two to four days. We close every project with a walkthrough — and a punch list, if needed.